TP WORKOVER PROJECT (BATMAN)

TP WORKOVER PROJECT (BATMAN)

Company :TP

Country : TURKEY

Project : PETROLEUM/GAS WORKOVER

Rig : IDECO-7

Start : 2008

TP WORKOVER PROJECT (ADIYAMAN)

TP WORKOVER PROJECT (ADIYAMAN)

Company :TP

Country : TURKEY

Project : PETROLEUM/GAS WORKOVER

Rig : IDECO-6

Start : 2008

TP WORKOVER PROJECT (BATMAN)

TP WORKOVER PROJECT (BATMAN)

Company :TP

Country : TURKEY

Project : PETROLEUM/GAS WORKOVER

Rig : IDECO-5

Start : 2008

TP WORKOVER PROJECT (BATMAN)

TP WORKOVER PROJECT (BATMAN)

Company :TP

Country : TURKEY

Project : PETROLEUM/GAS WORKOVER

Rig : IDECO-4

Start : 2008

MasPo GEOTHERMAL WELLS (DRILLING)

MasPo GEOTHERMAL WELLS (DRILLING)

Company :MasPo

Country : TURKEY 

Projects :GEOTHERMAL WELLS (DRILLING) 

Rıg(S) : F320/5(AC TOP DRIVE) 

Number Of Planned Wells : 10+15

Number of Completed Wells: 5

Start : 2012

MasPo Energy has awarded a 10+15 wells drilling contract to TPIC. Within this scope, operations were started on August 2012 with Rig F320/5 and 5 wells have been completed since then.

GURMAT GEOTHERMAL WELLS (DRILLING)

GURMAT GEOTHERMAL WELLS (DRILLING)

Company :GURMAT

Country : TURKEY 

Projects :GEOTHERMAL WELLS (DRILLING) 

Rıg(S) : F200/11 (AC TOP DRIVE) 

Number Of Planned Wells : 24 +8

Number of Completed Wells: 7

Start : 2015

Gurmat Elektrik Üretim A.Ş. has awarded a 24+8 wells drilling contract to TPIC. Within this scope, operations were started on September 2015 with Rig F200/11 and still are ongoing.

IRAQ/Rumaila Field Project

IRAQ/Rumaila Field Project

Company : SOC

Country : IRAQ

Project : OIL/GAS WELLS (Drilling)

Rig(s) : NOV1500/90-97 (AC TOP DRIVE)

The Number of Wells Planned : 45

The Number of Wells Completed  : 19

Start : 2010

Within the scope of a tender related to the drilling of 45 wells in the Supergiant South Rumaila Field, which is one of the largest and most important fields of Iraq, an IPM contract was signed with the South Oil Company(SOC) of Iraq in 14 March 2010. The drilling of first well RU-364 was started in 12 January 2011 and the fifth well RU-384 was drilled and delivered successfully on 14 August 2011. The Rumaila Field is operated by the “Rumaila Operating Organization (ROO)”, the consortium of BP-CNP-SOC where BP serves as the operator. An amended version of the contract was signed with SOC on 1 November 2012, where profitability and business volume of TPIC were reserved . From that date until today,  the technical and financial barriers related to the activation of the project which has a total volume of 338 Million USD have been removed. Right after the completion of 5 wells in 2011, drilling process has started again in May 2015. As of today, 19 wells were drilled in total. Currently, operations are ongoing.